A. Vigl, A.Walter, J.Lemmerer, G.Atzl, D.Handke |
TBM research project – Tolerances segmental lining |
Geomechanics and Tunnelling 9, 3/2016 |
2016 |
P.Gehwolf, A.Walter, R.Galler, H.Wagner |
Shear tests on flexible shear dowels for use at cross passages with thin segment linings |
Geomechanics and Tunneling 9, 3/2016 |
2016 |
A. Vigl |
System solutions for headraces in high head hydropower plants |
Geomechanics and Tunnelling 8, 1/2015 |
2015 |
A. Vigl |
Conventional Design of HPP Pressure Shafts according to G.SEEBER, considering the surrounding Rock Mass |
Proceedings of the 3rd International Conference on "High Strength Steels for Hydropower Plants", 2013 Graz, Austria |
2013 |
A. Vigl, R. Gerstner, F. Bartimoccia, M. Cruciani |
Headrace Tunnel and Tailrace Tunnel of the Beles MPP in Ethiopia |
Geomechanics and Tunnelling 6, 5/2013 |
2013 |
R. Gerstner, E. Netzer, A. Vigl |
Long-term behaviour of pressure tunnels |
Geomechanics and Tunnelling 6, 5/2013 |
2013 |
P. Romualdi, R. Grandori, C. Barwart |
Steel fibers reinforcement for precast lining system in tunnels: a new challenge |
Festschrift zum 60.Geburtstag von Alois Vigl |
2013 |
C. Barwart, P. Romualdi, A. Barioffi |
Headrace Tunnel of the El Alto Hydropower Project in Panama |
Geomechanics and Tunnelling 6, 4/2013 |
2013 |
G.Strappler, A. Vigl, R. Scheutz |
Two-layer lining in tunnel construction projects fot the ÖBB with continuous advance |
Geomechanik 1/2012 |
2012 |
A. Walter, C. Guimarães, R. Gerstner |
Palomino HRT - Exploration drillings in two geological formations |
Geomechanik 1/2012 |
2012 |
D. Handke, R. Matt, N. Wilfinger |
Mechanical and process-technical Characterisation of the Rock influenced by interactive Behaviour of Machine-Ground |
Tunnel 6/2011 |
2011 |
D. Bach, R. Hödl, J. Lemmerer, A. Vigl |
Risikoanalyse zur Wahl der geeigneten Vortriebsmethode für den Tunnel Pummersdorf |
Geomechanik und Tunnelbau 5/2011 |
2011 |
A. Vigl, C. Barwart |
Kopswerk II headrace tunnel - geomechanical and constrution design |
Geomechanics and Tunnelling 4/2011 |
2011 |
Z. Ekici, O. K. Wagner, C. Rüegg, J. Weigl, N. Salcher |
Selection of tunnelling methods for the New Semmering Base Tunnel |
Geomechanik 5/2011 |
2011 |
A. Vigl |
TBM, tunnelling methods |
Mostorest University Innsbruck |
2011 |
A. Vigl, J. Lemmerer, W. Lehner, K. Schmid, J. Kollegger |
Lastfalloptimiertes Dimensionierungskonzept für die Bewehrungseinsparung bei Stahlbetontübbingen |
Betontag 2010, Wien |
2010 |
D. Bach, M. Köpf, J. Lemmerer, N. Salcher |
TBM-S without active support at the limits of ist capabilities |
Geomechanik 5/2010 |
2010 |
A. Vigl, R. Gerstner |
Considerations of the crack water table and its fluctuation in pressure tunnel design and construction |
Geomechanic colloquium 2010 |
2010 |
A. Vigl, R. Gerstner |
Grouting in pressure tunnel construction |
Geomechanik 5/2009, Nr. 37 |
2009 |
A. Vigl |
Hartgesteins Tunnelbohrmaschinen der 3. Generation |
7.Tiroler Geotechnik und Tunnelbau-Tag (Innsbruck) |
2009 |
A. Vigl |
quo vadis TBM? oder - von den Seelenqualen einer eierlegenden Wollmilchsau |
4. Kolloquium: Felsmechanik - Theorie und Praxis 2007 |
2007 |
A. Vigl, W. Schubert, P. Posch, A. Walter, Manfred Blümel |
Investigations for a Convergence Compatible Lining System |
Felsbau 25 (2007), NR. 6 |
2007 |
G. Innerhofer, A. Vigl, R. Gerstner |
Druckstollenbau und Gebirgsmitwirkung |
Felsbau 25 (2007), NR. 5 |
2007 |
A. Vigl |
Geotechnische und systemimmanente Anforderungen an Druckstollen und -schächte und deren Umsetzung |
Vortragsreihe “Geotechnik”, TU Graz |
2007 |
H. Schnetzer, A. Vigl, H. Wannenmacher |
Kops II Pressure Tunnel - Technical Concept, Geotechnics and Construction |
Felsbau 24 (2006) |
2006 |
H. Steiner, A. Vigl, R. Vergeiner, N. Hörlein |
Leitungskollektor Graz HBF - Pressrohrvortrieb DN 3180 mit offenem Haubenschild |
Felsbau 23 (2005), Nr. 5 |
2005 |
G. Harer, C. Schönlechner, A. Vigl |
Koralm´s vertical shield driven shaft |
Tunnels & Tunnelling International/February 2005 |
2005 |
W. Schubert, A. Fasching, A. Vigl, C. Sutiwanich |
Evaluation of Construction Methods for the Mae Ngad - Mae Kuang Project |
Project report |
2005 |
E. Pürer, A. Vigl |
Sanierung alter Triebwasserstollen mit Fertigteil-Technologie am Beispiel der Druckstollen Lünersee und Vermunt |
EUROROCK 2004 & 53rd Geomechanics Colloquium |
2004 |
A. Vigl, B. Moritz, P. Sellner |
Paierdorf Exploration Shaft - Geotechnicla Design, Safety Control and Site Quality Management |
Felsbau 22 (2004), Nr. 6 |
2004 |
E. Tentschert, A. Vigl, A. Goricki |
The guideline fot the geomechanical design of underground structures with conventional excavation |
Felsbau 21 (2003) |
2003 |
A. Vigl |
TBM Support in Squeezing Rock - A Convergence-Compatible Segmental Lining System |
Felsbau 21 (2003), Nr.6 |
2003 |
E. Tentschert, A. Vigl, A. Goricki |
Guideline for Geomechanical Design für Underground Structures with Continuous Excavation |
Felsbau 21 (2003), Nr. 4 |
2003 |
A. Vigl, J. Benedikt, M. Eder, C. Rüegg, J. Lemmerer |
Vergleichende Riskoanalyse für konventionellen Vortireb und TBMVortrieb |
Felsbau 20 (2002), Nr. 5 |
2002 |
A. Goricki, W. Schubert, A. Steidl, A. Vigl |
Geotechnical Risk Assessment as the Basis for Cost Estimates in Tunnelling |
Felsbau 20 (2002), Nr. 5 |
2002 |
Benedikt, Eder, Lemmerer, Vigl |
Comparative risk assessment between conventional excavation and TBM at "Perschlingl" railway tunnels/austria |
Geomechnaical Kolloquium Salzburg - 2002 |
2002 |
R. Gerstner, E. Tentschert, A. Vigl |
Quantifizierung oder Qualifizierung geologischer Parameter für TBMVortriebe |
Felsbau 19 (2001), Nr. 5 |
2001 |
A. Vigl |
History of TBM´s under alpine conditions |
International Training Course; TBM´s for Alpine Rock Conditions, Sargans |
2001 |
A. Vigl |
Classification Strategies in TBM - Tunnelling |
Felsbau 19 (2001), Nr. 4 |
2001 |
E.H. Weiss, A. Vigl |
"Mediation" - a proper rool for risk assessment in tunnelling projects |
AITES - ITA 2001 World Tunnel Congress |
2001 |
A. Vigl |
Honeycomb Segmental Tunnel Linings - Simple, Economical, Successful |
Felsbau 18 (2000), Nr. 6 |
2000 |
A. Vigl |
Tunnel Plave, Doblar, Slovenien - 7- m-Doppelschild-TBM mit einschaligem hexagonalem Volltbbing-Auskleidungssystem |
Felsbau 18 (2000), Nr. 1 |
2000 |
A. Vigl |
Zusammenspiel zwischen der Geotechnik und Vortriebstechnik |
"Veröffentichungen des Instituts für Baugeologie; Band 2 - 1999" |
1999 |
L. Wagner, A. Vigl |
Spritzbeton als Endauskleidung für die Kraftwerksstollen KW Klösterle |
Tagungsband der 6. internen Fachtagung "Spritzbeton-Technologie" |
1999 |
A. Vigl, L. Wagner |
Shotcrete as final lining for the lead race channels of the hydroelectric power plant Klösterle - a decision with heart and intellect |
BMI 1/99 |
1999 |
A. Vigl |
Fräsen im Flysch und vergleichbaren geologischen Einheiten - Geotechnischen Verhalten beim Fräsvortrieb |
Veröffentichungen des Instituts für Baugeologie; Band 2 - 1999 |
1999 |
A. Vigl, W. Gütter, M. Jäger |
Doppelschild-TMB - Stand der Technik und Perspektiven |
Felsbau 17 (1999), Nr. 5 |
1999 |
A. Vigl |
Treatment of time related costs in tunneling contracts |
Proccedings of the workshop austrianhydropower-technology |
1998 |
A. Vigl |
State of the art tunnelling and tunnel design |
Austrian Hydel Power Construction Methodology |
1998 |
A. Vigl |
Sedimentation control in reservoirs |
Austrian Hydropower Technology, Workshop, New Delhi, 1998 |
1998 |
M. Jäger, A. Vigl |
Einschaliges Auskleidungskonzept für Druckstollen - Ein Fertigteil geht um die Welt |
Österreichischer Betontag 1998 |
1998 |
R. Gerstner, C. Wörle, A. Vigl |
Die Stollen des Kraftwerks Klösterle |
VEÖ - Journal; Heft 7; 1998 |
1998 |
G. Innerhofer, A. Vigl |
Tunnelling without reinforcement |
Proceedings of the world tunneling congress, ISBN 904510868, Rotterdam |
1997 |
G. Innerhofer, A. Vigl |
Tunnellining without reinforcement |
World Tunnel Congress ´97 |
1997 |
A. Vigl |
Mono-shell segmental lining for pressure tunnels |
Tunnels for People, Golser, Hinkel & Schubert |
1997 |
R. Mader, A. Vigl |
Energiebersorgungsunternehmen als anspruchsvoller Umsetzter von Theorie und Praxis |
Festschrift zum Jubiläum des Fachgebietes "Turbomaschinen und Fluidantriebstechnik" im Jahre 1997 |
1997 |
M. Jäger, A. Vigl |
Double shield TBM and open TBM in squeezing rock - A comparison |
Tunnels for People, Golser, Hinkel & Schubert |
1997 |
A. Vigl |
Die Freundschaft zum Wasser lehren |
Wasserbau-Visionen für das nächste Jahrtausend (Institut für Wasserbau, Universität Innsbruck) |
1997 |
A. Vigl |
Design method for TMB driven water & pressure tunnels |
2nd Mexican Congress of tunneling, engineering and underground works |
1997 |
M. Jäger, W. Gütter, A. Vigl |
12 km Trinkwasserstollen in Rekordzeit |
Felsbau 15 (1997), Nr. 5 |
1997 |
A. Vigl, E. Pürer |
Speicher Bolgenach - Feststoffbewirtschaftungskonzept und erforderliche Maßnahmen |
Internationales Symposium "Speicherverlandung"; 1996 ETH Zürich |
1996 |
R. Gerstner, A. Vigl |
Geologe und Bautechniker im Umgang mit dem geologisch bedingten Baurisiko |
Felsbau 14 (1996), Nr. 6 |
1996 |
R. Grandori, M. Jäger, F. Antonini, A. Vigl |
Evinos-Morinos Tunnel - Greece |
Proceedings of the 1995 Rapid Excavation & Tunneling Conference |
1995 |
A. Vigl |
Planung Evinos-Tunnel |
Felsbau 12 (1994), Nr. 6 |
1994 |
E. Netzer, A. Vigl |
Erhaltungsmaßnahmen am Druckstollen Lünersee nach 33 Jahren Betrieb |
Schriftenreihe zur Wasserwirtschaft, Technische Universität Graz |
1994 |
Brandstätter, Seeber, Vigl |
Kontinuierliche Erfassung der Gebirgsdeformation zum optimalen Einsatz der NATM beim Fräsvortrieb |
Wissen natm/Fassung 1- 2.3.88 |
1988 |
G. Seeber, A. Vigl |
Die Neue Österreichische Tunnelbaumethode und der mechanische Vortrieb mit Tunnelbohrmaschinen |
Felsbau 6 (1988), Nr. 2 |
1988 |
F. Schöberl, A. Vigl |
Constructive Measures for an outlet works at a gravel laden river |
Lausanne; AIAH -Congress - IAHR; 1987 |
1987 |
F. Schöberl, A. Vigl |
Prognose morphologischer Veränderungen in FlussStauhaltungen mit Hilfe hydraulischphysikalischer Modelle am Beispiel Oberer Inn/Staudamm Ovella |
Belgrad/XIII; Conference of the Danube Countries on Hydrological Forecasts |
1986 |